关键字

全部产品

  • 产品名称: BIOGAS MK SILOXANE REMOVAL SYSTEM
  • 浏览次数: 46

Landfill and sewage gas used in the biogas to energy industry is becoming increasingly contaminated with Siloxanes. The only permanent solution is to remove them before they reach the engine.

The Parker PpTek BioGas ManualKleen Siloxane Removal System (BGMK) is a Bio-Chemical filtering system that is fitted in the fuel supply line of a BioGas to Energy plant decontaminating landfill and sewage gas of siloxanes and other VOC's.

Fitted in the main BioGas supply it can also be used to filter siloxanes protecting boilers used to heat water on water treatment sites.

Using the same Parker PpTek patented media materials as the BioGas AutoKleen (BGAK) the unit is fitted with sufficient media to last approximately 3 months without the need for regeneration.

Features/Benefits

• Low capital costs

• Small size

• Minimum maintenance

• No moving parts

• On-site regeneration

• Filter cassette regeneration approximately every 3 months

• Stainless steel construction

• Atex approved Compliant (Zone 1 or 2)

• No engine warranty issues

• Environmentally safe

• No filter medium disposal cost

• Low pressure drop below 5mb

For more information or a detailed discussion about your specific requirements please contact Parker or an authorised Parker distributor.

最大流速 (CFM)
Up to 206
端口连接
4" or 6" PN16 Flanges
结构材料
Stainless Steel
品牌
Parker Hiross
重量 (KG)
250 - 650 Kg
重量 (LBS)
551 - 1433 lbs
高度
1.1 to 1.3m / 3.6 to 4.3ft
宽度
0.8 to 2.0m / 2.5 to 6.6ft

关键词: